Dublin City University

Requirement:Multi-story car park refurbishment
Product: Degafloor Car Park Top Deck System
Colour:N/A

Dublin City University

Car park refurbishment for Dublin City University

McKeon Construction Limited are a construction, fit-out and building services contractor who required a durable and innovative resin waterproofing system for one of their clients, Dublin City University (DCU). The university required car park refurbishment to a multi-storey car park where the existing deck coating had started to fail.

McKeon discussed the client requirements with Larsen Contracts (Ireland) Ltd, a specialist resin contractor. Larsen recommended the Degafloor Top Deck System for the car park refurbishment.

The Degafloor Car Park Top Deck System is designed to offer the outstanding flexibility and performance required for top decks of multi-storey car parks or to assist with car park refurbishments. The unique formulation allows installation to occur extremely quickly, with the main system of 23mm being installed in a single application process.

The car park refurbishment project was completed according to specification, within budget and on time. DCU and McKeon Construction Ltd are delighted with the results and the numerous benefits that the Degafloor Top Deck System has delivered, including outstanding durability, flexibility, a totally seamless and impervious finish, exceptional slip resistance and visually pleasing aesthetics.

To view the technical details of Degafloors products, you can download any of the Datasheets here.

Eddie O’Brien of Larsen Contracts Ltd commented: “The Degafloor Car Park Top Deck System enabled us to complete the installation within the short window of time available (weather-wise). Traditionally, we have been unable to complete car park projects outside of summer months due to weather and temperature constraints, but this new system has made it possible for us to complete car park installations all year round.”

Click here to view more work by Degafloor.

The Degafloor Car Park Top Deck system enabled us to complete the installation within the short window of time available (weather wise). Traditionally, we have been unable to complete car park refurbishment and projects outside of summer months due to weather and temperature constraints, but this new system has made it possible for us to complete car park installations all year round.

- Eddie O’Brien, Contracts Director, Larsen Contracts